TrubyBloki

Stacking must be done so that the joints were slightly shifted in a row to the side. When erecting the walls should be checked regularly plumb and level of accuracy of masonry, both horizontally and vertically. The upper part of the walls laid out in blocks, made of cellular concrete. Gas silicate blocks in this case will not fit. The device ochaga.Gorizontalnaya basis hearth grill brick poured into the formwork from the liquid concrete. From the same material can be made and the side shelf. As a framework for future focus, you can use a grid of welded fittings.

Caracas from a fixed grid solution directly to the cap. On both sides, slightly above the bottom of the hearth projections are made to secure the shelves and placed on the bottom of the refractory bricks. They are placed in three rows, the joints are moved slightly. The walls of heat-resistant bricks to lay out so that you can put frying bars on three levels. To do this you need to install one notch between the lower rows of bricks, and the second – between the second and third row. At the third level grid is placed on top, so the third row of brickwork should be be slightly narrower than the first two. The walls are being completed over the bricks with a special refractory mortar blocks of aerated concrete. Wind walls adjacent to the side shelves, as laid out cellular concrete to a height that allows secure.

TrubyBloki device to device base tube grill made of brick and the pipe itself are cut from a soft and porous concrete are stacked with an increasing narrowing. At the bottom of the pipe blocks of brick grill is attached to the supporting columns with refractory mortar. The top tube is covered laid on the four corner of brick column sheet of galvanized iron. Device navesDlya security grill made of brick from the sun and rain can arrange a stationary awning. He fixed metal corners, which are bolted to the plinth to the screws. As a basis canopy can serve four racks that are installed with spacers and fastened in the grooves of the horizontal bars. Bars additionally fixed with two props with the adjusting screws. Bars are attached to the rafters, and by him nailed shingles. It will be nice if the tile that is placed on the shingles will be combined with the color of tile, which is lined roof of the house. Trailing raboty.Pol grill brick is laid out around the hearth Bout seams sealed cement mortar. Booth must be laid on the prepared surface: it must be deepened to 10 cm and covered with a 0.5 cm well-compacted sand. Plastered concrete blocks, side shelves laid with ceramic tiles. Itself from a brick grill, if desired finished with decorative timbers.